Kitchen renovation from start to finish in North Anston Sheffield
- Rhys
- Jun 23
- 3 min read

Transforming a kitchen is a major project that requires careful planning and skilled execution. We recently renovated a tired old kitchen in North Anston, receiving the complete MyRa treatment. This process involved removing the old kitchen, rewiring, replumbing, plastering, and installing a brand-new Wren kitchen that now looks stunning. This post walks through each step of the project, offering insights and practical details for anyone considering a similar upgrade.
Removing the old kitchen

The first step in any full kitchen renovation is the rip out. This involves carefully dismantling and removing all existing cabinets, appliances, countertops, and fixtures. In this North Anston project, the team started by disconnecting utilities and then stripping the kitchen down to its bare structure. This stage is crucial because it reveals any hidden issues like outdated wiring or plumbing that need attention before the new kitchen can go in.
Removing the old kitchen also allows for a fresh start with the layout. Sometimes, homeowners want to change the kitchen’s footprint or improve the flow between cooking, dining, and living areas. In this case, the layout was changed from a galley to a U shape. It was also modernised with better positioning of sockets and plumbing points.
Rewiring for safety and convenience
Once the old kitchen was removed, the next step was rewiring. Kitchens require a lot of electrical power for appliances, lighting, and sockets. The existing wiring often does not meet current safety standards or the demands of modern appliances.
The MyRa treatment included a full rewire to ensure safety and functionality. New circuits were installed for heavy appliances like ovens and microwaves, and additional sockets were added for convenience. The lighting plan was also updated, with under-cabinet lighting to brighten work surfaces.
Rewiring also involved installing switches in more accessible locations and ensuring all wiring was properly insulated and compliant with building regulations. This step is essential to avoid electrical hazards and to future-proof the kitchen.
Replumbing for efficiency and reliability

Alongside rewiring, replumbing was carried out to remove a radiator and to relocate the sink. Kitchens rely on plumbing for sinks, dishwashers, and sometimes refrigerators with water dispensers or ice makers.
The team replaced outdated pipes with modern materials that resist corrosion and leaks. They also repositioned plumbing points to match the new kitchen layout, making sure everything was aligned with the new sink and appliances.
Good plumbing work prevents leaks and water damage, which can be costly and disruptive. It also ensures that water pressure is consistent and that drainage works smoothly.
Plastering for a flawless finish
After rewiring and replumbing, one of the walls needed attention. Removing the old kitchen and installing new wiring and pipes often damages plasterwork. To create a clean, smooth surface ready for painting or tiling, plastering was necessary.

The plastering team applied fresh plaster to all affected areas, filling holes and smoothing uneven surfaces. This step is often overlooked but makes a big difference in the final look of the kitchen. Well done plastering ensures that paint and tiles adhere properly and that the kitchen feels fresh and new.
Installing the new kitchen

With the groundwork complete, the new kitchen installation began. This stage involved fitting cabinets, worktops, appliances, and fixtures according to the design plan.
The MyRa treatment included high quality cabinetry supplied by Wren Sheffield, installed with precision. Worktops were carefully measured and cut to fit perfectly. Appliances were integrated seamlessly, creating a sleek look. We even made the boiler disappear.

The installation team paid close attention to details like door alignment, handle placement, and lighting installation. The result is a kitchen that not only looks stunning but also functions efficiently.
Final touches and the stunning result

After installation, the kitchen received final touches such as fitting splashbacks, installing handles, and connecting appliances. The space was cleaned thoroughly to remove dust and debris from the renovation.
The finished kitchen in North Anston is a dramatic transformation from the old space. It combines shaker style with practical features, making it a joy to cook and entertain in. The careful rewiring and replumbing ensure the kitchen is safe and reliable for years to come.

This project shows how a full kitchen rip out and install can be done smoothly with the right expertise. Each step builds on the last to create a space that looks great and works well.
What this means for your kitchen project
If you are thinking about a kitchen renovation, this example from North Anston highlights key points to consider:
Plan for a full rip out if your kitchen is outdated or damaged. It allows you to start fresh.
Update wiring and plumbing to meet current standards and support modern appliances.
Don’t skip plastering after construction work to ensure a smooth finish.
Choose quality installation to get a kitchen that looks great and functions well.




Comments